Supervision in the work of road mapping and massive earth movement for the formation of platforms and bases for the structure that will form the flotation grinding equipment for the PAT project.
Coordination with the corresponding authorities for the use of explosives in required places through controlled works and with the greatest safety for the removal of rocky material.
Supervision and coordination in the construction of anchored walls that serve as containment of the land in the areas of flotation and HPGR of the Toquepala Expansion Project.